Farmington Street Crack Sealing Begins April 24
Published on Apr 21, 2017 15:02

Street Crack Sealing

Asphalt streets are designed to be flexible to accommodate the freeze/thaw cycle of our climate. Subsequently, longitudinal and transverse (thermal) cracking will occur in relatively new streets continuing throughout its life due to age, traffic, weather, etc. To minimize the infiltration of water through these cracks, they are periodically sealed with a flexible asphalt sealant.
The contractor will be starting the crack seal project on Monday, April 24, 2017. The work will last about one week, depending on weather. Please obey posted no parking signs. Visit the Engineering project page for a map and project details below:

City of Farmington | All Rights Reserved | Powered by CivicLive | © 2024 Civiclive.